Amsterdam · Zaandam · Haarlem · North Holland

House Renovation in the Netherlands: One Contractor for the Whole Home

LucKey Construction is a contractor from Zaandam for home renovation in Amsterdam and across the Netherlands, from strip-out to the last coat of paint.

In short

  • What: strip-out, structural work, plumbing, electrics, heating, plastering, floors, kitchen, bathroom and painting.
  • Order: strip-out and structure first, then pipes and electrics, then walls and floors, finishing last.
  • Permits and VvE: you arrange them as the owner; we tell you what the work involves.

★★★★★ 4.7 on Google, 102 reviews

Abcoude, house renovation: a new brick extension with large sliding glass doors at the back of the house, with dormers on the roof above

Before and after

One house in Abcoude, before and after

Drag the line to compare. A full renovation in Abcoude: the attic room under the dormer, and the ground floor from the shell of the new extension to the finished room.

Before: the attic room under the dormer windows, with old cupboards and worn wallsAfter: the same room as a bedroom, with smooth white walls, new storage and carpetBeforeAfter
Abcoude: the attic room under the dormer
Before: the new extension as a shell, with a steel beam, timber joists and bare block wallsAfter: the finished ground floor, with the beams boxed into the ceiling, the kitchen and a wood-look floorBeforeAfter
Abcoude: from the shell to the finished ground floor

Order of work

How a house is renovated, step by step

Every house is different, but most full renovations follow the same order. The planning for your house is in the offer.

1. Visit and offer

We come and look, measure and check the structure, pipes and electrics. You then get a detailed offer with the work, the materials and the expected duration.

2. Strip-out

What has to go comes out: the old kitchen, bathroom, floors and walls. We take the building waste away. More about strip-out

3. Structural work

Load-bearing walls out with steel, an extension or a dormer. A structural engineer calculates what the house has to carry. More about walls and steel

4. Pipes, electrics and heating

New supply and drain pipes, groups and wiring, underfloor heating or radiators, while the walls and floors are still open. More about underfloor heating

5. Walls, ceilings and floors

Plastering, new floors and tiles, so the rooms are ready for the kitchen, the bathroom and the paint. More about plastering

6. Kitchen, bathroom and finishing

Kitchen and sanitaryware fitted, then painting, skirting and doors. When the work is done, we walk through the house with you. More about bathrooms

Abcoude, house renovation during the work: a timber frame for a new wall on the attic landing, beside the stairwell
Abcoude: a new wall framed on the attic landing

Why people choose us

What you can count on

  • One contractor for every trade

    Demolition, structural work, plumber, electrician, plasterer, tiler and painter in one planning. You do not have to find and schedule them yourself.

  • Your plan, checked and built

    The plan usually comes from you or your architect. We look at the house, check that the plan works in practice and build it.

  • A clean site every day

    The working area is cleaned before we leave each day, and we use tools that keep dust down.

  • One-year warranty

    We give a one-year warranty on our work, and we are insured against damage.

What clients say

Rated 4.7 on Google

★★★★★4.7 out of 5 · 102 reviews

★★★★★
“Thank you very much for all te hard work and good worksmanship! If we have any renovation plans in the future, we will definitely think of you. The guys all were truly professional and respectful, our compliments!”
Korian R. · Google review, September 2026
Read all 102 reviews on Google

How it works

From first message to a clear offer

Every house is different. Once we have measured on site, you get a price for your house, not an estimate.

Book a free consultation
  1. 01

    You send your details

    The form, or a call. A few lines about the house and what you want changed is enough to start; photos or drawings help.

  2. 02

    We come and look

    We contact you to arrange a visit. We check the structure, the pipes and the electrics against your plan, and measure.

  3. 03

    You get a transparent offer

    A detailed offer with the work, the materials and the expected duration, so you know what you are agreeing to before anything starts.

Details

From the house in Abcoude

Abcoude, house renovation: the new extension as a shell, with scaffolding, a wheelbarrow of bricks and the dormers on the roof behind
Abcoude: the extension as a shell, before the glass went in
Abcoude, house renovation: a metal stud frame around the boiler and its pipes, ready for boarding
Abcoude: a frame around the boiler, ready for boarding
Abcoude, house renovation: a wall-hung washbasin with a chrome trap on large grey tiles
Abcoude: a washbasin on large grey tiles

Questions

Questions about house renovation

Which work is part of a full house renovation?

Everything the house needs, in one project: strip-out, structural work such as load-bearing walls, extensions and dormers, plumbing, electrics and heating, plastering, floors, kitchen, bathroom and painting. You can also renovate part of the house, such as one floor or a few rooms.

In what order is a house renovated?

Usually strip-out first, then the structural work, then pipes, electrics and heating while the walls are still open, then plastering and floors, and the kitchen, bathroom and painting last. The planning for your house is in the offer.

Do I need a permit or consent from the owners' association?

That depends on the house and the work. A load-bearing wall, an extension, a dormer or a listed building can need a permit, and in an apartment the owners' association (VvE) often has to agree. You arrange the permit and the consent as the owner; we tell you what the work involves.

How much does a house renovation cost?

That depends on the house, the work and the materials you choose. That is why we do not name an amount in advance: after a visit on site you get a detailed offer with the work and the materials in it.

How long does a house renovation take?

That depends on the size of the work. A bathroom takes on average two and a half to four weeks and a kitchen two to three weeks. For a whole house, the planning is in the offer.

Can you work from my own design or my architect's plan?

Yes. Most renovations start from the client's own plan. We look at the house, check that the plan works in practice and build it.

Do I get a warranty?

Yes, a one-year warranty on our work. We are also insured against damage during the work.

Where do you work?

We are based in Zaandam and renovate houses in Amsterdam, across North Holland and further afield in the Netherlands.

Book a free consultation

Tell us about your house and we get back to you quickly. No obligation.

Open now · on the phone until 18:00

    JPG, PNG or PDF, up to 10 MB. A photo often saves a site visit and gets you a price sooner.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    WhatsAppFree consultation

    We use cookies for statistics and to measure our advertising. Privacy statement