Zaandam · Amsterdam · Haarlem · North Holland

Roof extension: an extra storey, starting with the structure

We build an extra storey on a flat roof, raise the whole roof or raise the ridge: in Dutch a dakopbouw, optopping or nokverhoging. We build from the design you provide, after a structural calculation by the engineer we work with. You get a written offer before anything starts.

★★★★★ 4.7 on Google, 102 reviews

Before and after

Roof and top-floor work, before and after

Drag the line to compare. Dormer and top-floor jobs in Vleuten and Amstelveen, each photographed during the work and again later from the same spot.

Before: the prefab dormer hanging from the crane as it is lowered into the opening in the back roofAfter: the dormer set in the roof, with the crane's straps hanging freeBeforeAfter
Vleuten: a prefab dormer lowered in by crane
Before: the attic during the work, with plasterboard on the roof slopes, insulation on the floor and a scaffold towerAfter: the same attic finished and lived in, with a dormer window on the left and a roof window on the rightBeforeAfter
Vleuten: the attic during the work and after it
Before: the front of the house during the work, with a mobile scaffold against the façadeAfter: the same front once the scaffold was gone, with the top floor in viewBeforeAfter
Amstelveen: the front during and after the top-floor work

What the work involves

From the calculation to the new floor

Our own people and subcontractors we trust, with the structural engineer we work with for the calculation. Items with a link have a page of their own.

The structural calculation first

Before the work, the recognised structural engineer we work with calculates whether the walls, the existing roof and the foundation can carry the new storey.

Steel beams

Where the calculation shows steel is needed, the beams that carry the new storey.

The storey, prefab or built on site

Walls and roof made in a factory and set on the house by crane, or built up on the roof under a temporary cover. Timber frame suits the work because it is light.

The roof covering

The roof on the new storey is part of our roofing work.

Insulation to the building rules

New walls and roof at Rc 1.4 at least. In a major renovation the new-build values apply: Rc 4.7 for walls and 6.3 for the roof.

A staircase to the new floor

The new floor needs a staircase, and it takes room on the floor below.

A smoke alarm

Every floor of a home needs a working smoke alarm since 1 July 2022, the new one included.

The inside finished

Once the storey is closed, the inside is finished. We supply the raw building materials; you choose and supply the finishes.

Would a dormer be enough?

A dormer sits in the roof slope and leaves the ridge where it is. Dormers have a page of their own.

New attic bathroom under the roof slope, with a roof window, walk-in shower and wall-hung toilet
A new bathroom under the roof slope

Why people choose us

What you can count on

  • The structure comes first

    No building before the calculation. If the foundation cannot take the load, the plan changes or the foundation comes first.

  • Prefab or built on site: you choose

    Prefab needs room for a crane and works within the system's sizes; manufacturers close the house against wind and rain in one day. Built on site takes longer and leaves more freedom in shape, size and materials.

  • A clean site every day

    The top of the house is open for a while either way. Our crew cleans up daily and works with dust extraction.

  • One-year warranty

    We give a one-year warranty on our work, and we are insured against accidental damage.

What clients say

Rated 4.7 on Google

★★★★★4.7 out of 5 · 102 reviews

★★★★★
“Thank you very much for all te hard work and good worksmanship! If we have any renovation plans in the future, we will definitely think of you. The guys all were truly professional and respectful, our compliments!”
Korian R. · Google review, September 2026
Read all 102 reviews on Google

How it works

From first message to a clear offer

The cost follows from the structural calculation, the size, the method and the finish of your house. So you get a written offer after the survey, not an estimate.

Book a free consultation
  1. 01

    You send your details

    The form, or a call. A few lines about your house and your plans is enough to start.

  2. 02

    We come and look

    We contact you to arrange a survey. Our account manager visits and measures, and we point out which permits the job is likely to need.

  3. 03

    You get a transparent offer

    A written offer with materials, labour, what you buy yourself and the approximate duration, so you know what you are agreeing to before anything starts.

Details

Work on roofs and top floors

Rigid insulation boards and timber battens being fixed on a flat roof
Insulation boards on a flat roof
Strips of new bitumen roofing laid side by side on a flat roof, with a roof vent and the neighbouring roofs beyond
New roofing on a flat roof
Box gutter between two flat roofs during re-lining, with offcuts of roofing felt alongside
A box gutter being relined
Attic during fit-out: new laminate floor laid, knee-wall storage being built, roof windows above
An attic during fit-out
Finished attic room with storage above the doorway and a roof window in the bathroom beyond
A finished room under the roof
Newly finished attic bedroom with a sloping ceiling, plastered walls and a wood-look floor
A bedroom under a sloping ceiling

Questions

Before you start

Where does the price of a roof extension come from?

We give no prices here: the cost follows from the structural calculation, the size, the method and the finish of your house. After the survey you receive a written offer.

Do I need a permit for a roof extension?

Almost always, for two activities: the technical building activity and the omgevingsplanactiviteit. A nokverhoging too: it raises the ridge, while a permit-free dormer must stay more than 0.5 m below it. Applying for the permit, and informing the municipality and the VvE where needed, is the owner's responsibility. At the survey we point out which permits the job is likely to need.

Can my house carry an extra storey?

That is the first check. The foundation was calculated for the house as it was built, and much of Zaanstad stands on short wooden piles in soft ground. The structural engineer we work with calculates whether the walls, the existing roof and the foundation can take the new storey, and where steel beams are needed. If the foundation cannot take the load, the plan changes or the foundation comes first.

Dormer or roof extension: what is the difference?

A dormer (dakkapel) sits in the roof slope and leaves the ridge alone; a roof extension adds a storey or raises the roof itself. One local exception: Zaanstad's appearance policy treats the typical Zaanse dakkapel, which rises straight from the eaves, as formally a dakopbouw.

Who makes the design?

You provide the design and we build from it. We can suggest designers in Amsterdam, and the engineer we work with makes the structural calculation.

What about the neighbours and the VvE?

In a terraced street, talk to the neighbours before you apply: the extension changes their view and sometimes their sun, and after publication they have 6 weeks to object. In an apartment building the flat roof is normally a shared part. Taking it into permanent, exclusive use means changing the deed of division (splitsingsakte), which in principle needs all owners; a VvE vote alone is not enough.

How long does a roof extension take?

The permit comes first: normally 8 weeks, up to 14 with an extension. Prefab elements go up in a day, building on site takes longer, and the inside is finished afterwards. Our offer gives the approximate duration.

Can I stay at home during the work?

Either way the top of the house is open for a while. Whether you can stay depends on the house and the method; we go through it at the survey.

Book a free consultation

Tell us about your house and your plans. The first consultation is free and without obligation.

Open now · on the phone until 18:00

    JPG, PNG or PDF, up to 10 MB. A photo often saves a site visit and gets you a price sooner.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    WhatsAppFree consultation

    We use cookies for statistics and to measure our advertising. Privacy statement